Starmount Solutions Limited / ICT supply & solutions+254 714 362 738/sales@starmount.co.ke
Starmount Solutions

Structured Cabling & Fibre Installation in Kenya

Structured Cabling & Fibre

Give every connection a solid foundation.

Plan labelled network points, tidy racks and fibre links for new offices, renovations and multi-building sites.

A network rack with neatly routed cables

Cable desks and devices

Plan CAT6 outlets for workstations, phones, access points and cameras.

Organise your network rack

Bring cables into labelled patch panels and allow space for switches, power and future expansion.

Link floors and buildings

Choose fibre where distances, bandwidth or the site layout call for it.

Where structured cabling helps

New offices and fit-outs

Plan outlet positions before furniture and ceilings go in. Include reception phones, meeting rooms, access points and shared printers.

Office moves and upgrades

Trace existing outlets, replace damaged runs and label both ends so future changes are easier.

Multiple floors or buildings

Plan a fibre backbone where distance or bandwidth requires it. Allow for termination, switch ports and spare capacity.

From floor plan to tested connection

  1. Map the site. Mark outlet positions, cabinet locations and cable routes. Confirm access to ceilings and risers.
  2. Install and label. Run cables, terminate them at outlets and patch panels, and label each end with a matching reference.
  3. Test and hand over. Agree how copper and fibre links will be tested and ask for the outlet schedule and test results at handover.

Questions before you buy

When should I use fibre instead of CAT6?

CAT6 works well for many desk and device connections. Fibre is often a better fit for longer backbone links and connections between buildings.

Can you extend an existing installation?

Share your rack layout and outlet count. We can check cable routes, spare patch panel space and available switch ports before proposing an extension.

Can I add network points before buying switches?

Yes. Plan cable routes and outlets first, then choose switches for the number of active ports, uplinks and devices that need PoE.

What to include in your quote request

Share the site location, floor plans, estimated outlet count and cabinet locations. For fibre, include the buildings or floors to connect and approximate distances.

Continue to WhatsApp
WhatsApp